Manual Radiator Valve with Solder Connection (V21-007)

Product Details
Customization: Available
Maximum Working Temperatures: 90° C
Max. Pressure: 10bar
Manufacturer/Factory, Trading Company
Gold Member Since 2008

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
1000000 RMB
Plant Area
>2000 square meters
  • Manual Radiator Valve with Solder Connection (V21-007)
  • Manual Radiator Valve with Solder Connection (V21-007)
  • Manual Radiator Valve with Solder Connection (V21-007)
  • Manual Radiator Valve with Solder Connection (V21-007)
  • Manual Radiator Valve with Solder Connection (V21-007)
  • Manual Radiator Valve with Solder Connection (V21-007)
Find Similar Products
  • Overview
  • Company Profile
Overview

Basic Info.

Model NO.
V21-007
Type
Soldered Straight Radiator Valve with Gland
Body
Brass
Transport Package
Carton
Specification
1/2"x15
Trademark
OEM
Origin
CHINA
HS Code
848190100

Product Description

Manual Radiator Valve with Solder Connection (V21-007)RUNNER Sanitary is established in 1998, with rich experience in water and heating system business, SANITARYTEK is our registered brand. One-stop station, including full line of brass gate valve, brass ball valve, check valve, angle valves, bibcock, water-meter valve, radiator valves, faucets, hose, shower, fittings and accessories etc.

Product Description


Straight Radiator Valve for iron pipes with screw connector, with plastic handle, M/F

Manual Radiator Valve with Solder Connection (V21-007)
Model No.
V21-007
Soldered straight radiator valve with plastic handle

Body in brass nickel-plated
1. For soldered to copper pipes
2. Connecting radiator to supply pipe made of copper; manual regulation valve
3. Max temperature 90 °C
 
Available brass finish
 
Products Name Soldered straight radiator valve with plastic handle
Material brass
Handle manutal handle
Size 1/2″x15mm
Thread BSP, NPT also can be follwed
Working Pressure 16 bar
Working Temperature 0ºC to 90ºC
Finish nickel plated
Sample FREE(Click here to get free sample)

 

Manual Radiator Valve with Solder Connection (V21-007)
Manual Radiator Valve with Solder Connection (V21-007)
Manual Radiator Valve with Solder Connection (V21-007)
Manual Radiator Valve with Solder Connection (V21-007)

Manual Radiator Valve with Solder Connection (V21-007)View more products,you can click product keywords...   
Company Profile

Manual Radiator Valve with Solder Connection (V21-007)Manual Radiator Valve with Solder Connection (V21-007)

Manual Radiator Valve with Solder Connection (V21-007)
FAQ
 
Q1: When can I get the quotation lf l send an enquiry at your website?
We usually quote or reply within 5 minutes-6 hours after we get your inquiry.

Q2: What is your MOQ? Can we order small amount ?
Usually our MOQ is 1,000pcs.Trial orders and further requests can Be negotiated.

Q3: How can we get a sample to check your quality?
After price confirmation, you can require samples to check our quality. If you need the samples, we will charge for the sample cost. But the sample cost can be refundable after order confirmation when your quantity of the order is more about the MOQ.

Q4: Can you do the design for us?
Yes, we have a professional team with rich experience in manufacturing. We are able to supply customized sizes, grades of material, and coating. We also could supply the package according to your request the sample cost. But the sample cost can be refundable after order confirmation when your quantity of the order is more about the MOQ.

Q5: How long can I expect to get the sample?
After you pay the samples charge and send us confirmed files, the samples will be ready in 1-5 days for the regular specification. Or it will take about 15 days to produce new samples. The samples will be sent to you via express and arrive in 3-5 days. You can use your own express account or prepay us if you don't have an account.

Q6: What is your payment term?
Normally,T/T 30% down payment, 70% balance to be paid before shipment. or  Irrevocable L/C at sight.

Q7: What about the lead time for mass production?
Usually will be around 30~35days.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier