Chrome Stainless Steel Double Lock Hand Shower Hose (H01-003)

Product Details
Customization: Available
Packing: Poly Bag
Certification: ISO9001
Manufacturer/Factory, Trading Company
Gold Member Since 2008

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
1000000 RMB
Plant Area
>2000 square meters
  • Chrome Stainless Steel Double Lock Hand Shower Hose (H01-003)
  • Chrome Stainless Steel Double Lock Hand Shower Hose (H01-003)
  • Chrome Stainless Steel Double Lock Hand Shower Hose (H01-003)
  • Chrome Stainless Steel Double Lock Hand Shower Hose (H01-003)
  • Chrome Stainless Steel Double Lock Hand Shower Hose (H01-003)
  • Chrome Stainless Steel Double Lock Hand Shower Hose (H01-003)
Find Similar Products
  • Overview
  • Company Profile
Overview

Basic Info.

Model NO.
H01-003
Color
Silver
Surface Treatment
Chrome Plating
Inner tube Material
EPDM
Outer Material
Stainless Steel
Transport Package
1PCS/Poly Bag 50PCS/CTN
Specification
1/2" x 150 cm
Trademark
OEM
Origin
Ningbo China
HS Code
7307290000
Production Capacity
100000/Month

Product Description

Chrome Stainless Steel Double Lock Hand Shower Hose (H01-003)
Code: H01-003
No extendable double-lock shower hose,stainless steel or brass chrome-plated
Size: F1/2"XF1/2"X150cm
Length: 1.5m or according to your reuqirement 


1> Use for bathroom.
2> EPDM / PVC inner hose.
3> Hose body: Stainless steel or brass chrome plated is optional.
4> Packaged in a bag or Blister packaging.

Features: 
1)Connects firmly 
2)Has long performance life 
3)High flexibility 
4)Can be bent freely 
5)Working Pressure: 6Bar 
6)Test Pressure: 10Bar 
7)Burst Pressure: 100Bar 
8)Working Temperature: -40~120 
9)Corrosion resistant 
10)Won't jam gas 
11)Hose ripple: Dense corrugated circular wave 
12)Thickness of stainless steel sheets: 0.18-0.2mm 
13)mainly market: Italy, Romania, agentina, Spain, UK. 

Factory Tight Stainless Steel Double Lock Shower Hose Flexible Hose OEM/ODM (H01-003)

Chrome Stainless Steel Double Lock Hand Shower Hose (H01-003)
Chrome Stainless Steel Double Lock Hand Shower Hose (H01-003)
Chrome Stainless Steel Double Lock Hand Shower Hose (H01-003)Chrome Stainless Steel Double Lock Hand Shower Hose (H01-003)

Chrome Stainless Steel Double Lock Hand Shower Hose (H01-003)View more products,you can click product keywords...   
Company Profile

Chrome Stainless Steel Double Lock Hand Shower Hose (H01-003)

Chrome Stainless Steel Double Lock Hand Shower Hose (H01-003)
 

Chrome Stainless Steel Double Lock Hand Shower Hose (H01-003)Chrome Stainless Steel Double Lock Hand Shower Hose (H01-003)
FAQ
 
Q1: When can I get the quotation lf l send an enquiry at your website?
We usually quote or reply within 5 minutes-6 hours after we get your inquiry.

Q2: What is your MOQ? Can we order small amount ?
Usually our MOQ is 1,000pcs.Trial orders and further requests can Be negotiated.

Q3: How can we get a sample to check your quality?
After price confirmation, you can require samples to check our quality. If you need the samples, we will charge for the sample cost. But the sample cost can be refundable after order confirmation when your quantity of the order is more about the MOQ.

Q4: Can you do the design for us?
Yes, we have a professional team with rich experience in manufacturing. We are able to supply customized sizes, grades of material, and coating. We also could supply the package according to your request the sample cost. But the sample cost can be refundable after order confirmation when your quantity of the order is more about the MOQ.

Q5: How long can I expect to get the sample?
After you pay the samples charge and send us confirmed files, the samples will be ready in 1-5 days for the regular specification. Or it will take about 15 days to produce new samples. The samples will be sent to you via express and arrive in 3-5 days. You can use your own express account or prepay us if you don't have an account.

Q6: What is your payment term?
Normally,T/T 30% down payment, 70% balance to be paid before shipment. or  Irrevocable L/C at sight.

Q7: What about the lead time for mass production?
Usually will be around 30~35days.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier